Hallen Construction recently undertook a challenging operation to retrieve an in-line inspection tool.
Hallen Construction recently undertook a challenging operation to retrieve an in-line inspection tool.
With many years of experience working with major utilities, Hallen are experts in the field of Pipeline work.
Hallen Construction Company has installed miles of transmission cable on projects which have included welded steel pipe for oil cooled cable, fused HDPE pipe and direct burial cable.
Hallen Construction Company has installed miles of transmission cable on projects which have included welded steel pipe for oil cooled cable, fused HDPE pipe and direct burial cable.
Approximately 7,500 ft. of welded 30” .625 wall steel pipe, rated at 740 psig and installed to transmission gas pipeline standards in Brownsville, Brooklyn, NY.
Excavation and installation of about 68 miles of pipe, which originated in Sayreville, NJ and terminated in Hicksville, NY.
The Metering and Regulating station is the termination of a 37-mile pipeline that begins in Northport and runs in the Long Island Sound.